Sugiarto, Badaruddin (2022) Determination of erosion and sedimentation potential for sump design at the nickel mine site of PT VALE Petea Indonesia. INTEK: Jurnal Penelitian, 9 (2). pp. 113-121. ISSN 2615-5427
Badaruddin et al. 2022.pdf
Download (1MB)
Badaruddin et al 2022_similarity checked.pdf
Download (3MB)
Abstract
PT. Vale Indonesia is planning to conduct open-pit mining at the Petea location, which is situated upstream in the Lamunto watershed. Prior to the mining activities, measures need to be taken to prevent any harm and damage to the surrounding environment, especially with regard to soil erosion, which could potentially impact the Lamunto watershed, as it serves as the outlet for the mining location. The USLE (Universal Soil Loss Equation) method, aided by the ArcGIS application, was used to analyze the potential erosion that could occur. Additionally, the sedimentation rate was calculated using the SDR (Sediment Delivery Ratio) equation, based on the erosion rate and the area of the mining plan, in order to plan for sediment storage tanks, or sumps. The results of the study revealed that the sediment potential for sumps A, B, C, D, E, F, G, and H was 550.39 m3/year, 1195.31 m3/year, 1588.43 m3/year, 1908.27 m3/year, 2423.33 m3/year, 1899.53 m3/year, 1941.76 m3/year, 2169.15 m3/year, and 2756.29 m3/year, respectively. The slope factor (LS) was found to be more influential than the catchment area in calculating sediment potential, as evidenced by the greater sediment potential in sump D compared to sump F.
Item Type: | Article |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Jurusan Teknik Sipil > D3 Teknik Konstruksi Gedung |
Depositing User: | Sugiarto Badaruddin |
Date Deposited: | 01 May 2023 08:25 |
Last Modified: | 01 May 2023 08:29 |
URI: | https://repository.poliupg.ac.id/id/eprint/1132 |