Search for collections on PNUP Repository

Implementasi Over Load Shedding (OLS) Pada Interbus Transformator(IBT) #3 31.5 Mva Dan IBT #5 31.5 MVA Di GI Tello 150/66 kV Untuk Menjaga Keandalan Suplai Ke GI Borongloe, GI Daya Dan GI Mandai

Thaha, Sarma and Adiyanti, Annisya and Usman, Usman and Sultan, Ahmad Rizal (2022) Implementasi Over Load Shedding (OLS) Pada Interbus Transformator(IBT) #3 31.5 Mva Dan IBT #5 31.5 MVA Di GI Tello 150/66 kV Untuk Menjaga Keandalan Suplai Ke GI Borongloe, GI Daya Dan GI Mandai. Jurnal Teknologi Elekterika, 19 (1). pp. 64-70. ISSN 1412-8764

[thumbnail of Elekterika_Mei 2022.pdf] Text
Elekterika_Mei 2022.pdf - Published Version

Download (541kB)

Abstract

Interbus transformer (IBT) is transformer that transfer power in different voltage level. Tello Substation
has two IBT that change voltage level from 150 kV to 66 kV. In order to maintain the reliability operation of
Tello substation, both IBT must be not allowed to overload. Overload condition could occur if one of the
transformers is fault, the normal transformer will be overload. If an overload condition occurs, the two IBTs
may not operate simultaneously. Due to this condition, it is necessary to prevent the occurrence of overload
condition by applying overload shedding (OLS). This OLS application can prevent overload on the transformer
if one of the transformers out of service due to fault condition. The OLS relay will work when the load on the IBT
has reached its setting, by releasing the load on the 66 kV system line according to the OLS scheme as a
precautionary step before all transformers trip. This research uses a case study on the Makassar Subsystem,
which is one of the Sulbagsel System's electrical systems. The results showed that the amount of load that needed
to be removed when implementing the OLS scheme at IBT #3 and IBT #5 31.5 MVA GI Tello was 16.86 MW. The
OLS and OCR schemes are coordinated with the OLS setting current at each IBT GI Tello is 302.5 A, while the
setting current for OCR at each IBT GI Tello is 330 and time multiple setting ( tms) is 1.96

Item Type: Article
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Jurusan Teknik Elektro > D4 Teknik Listrik
Depositing User: Mr Ahmad Rizal Sultan
Date Deposited: 29 Apr 2023 10:30
Last Modified: 29 Apr 2023 10:30
URI: https://repository.poliupg.ac.id/id/eprint/987

Actions (login required)

View Item