Fatur, Rahman and Muh. Wahyu, Musmuliyadi (2017) Model Keterlambatan Serta Pengendalian Waktu Dan Biaya Pada Proyek Gedung Serbaguna Kws. Rujab Gubernur Sul-Sel. Diploma thesis, Politeknik Negeri Ujung Pandang.
Text (Skripsi)
MODEL KETERLAMBATAN SERTA PENGENDALIAN WAKTU DAN BIAYA PADA PROYEK GEDUNG SERBAGUNA KWS. RUJAB GUBERNUR SUL-SEL.pdf - Published Version
Restricted to Registered users only
Download (7MB)
MODEL KETERLAMBATAN SERTA PENGENDALIAN WAKTU DAN BIAYA PADA PROYEK GEDUNG SERBAGUNA KWS. RUJAB GUBERNUR SUL-SEL.pdf - Published Version
Restricted to Registered users only
Download (7MB)
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Jurusan Teknik Sipil > D4 Jasa Konstruksi |
Depositing User: | Rahmawati S.Sos |
Date Deposited: | 27 Apr 2023 02:12 |
Last Modified: | 27 Apr 2023 02:12 |
URI: | https://repository.poliupg.ac.id/id/eprint/735 |