Search for collections on PNUP Repository

PENERAPAN PLTS RUMAH BERPANGGUNG TERAPUNG HUNIAN NELAYAN

Musrady, Mulyadi and Tasrif, Tasrif and Muhammad, Iswar and Rustan, Effendy (2020) PENERAPAN PLTS RUMAH BERPANGGUNG TERAPUNG HUNIAN NELAYAN. Prosiding Seminar Nasional Pengabdian Kepada Masyarakat 2020, 5. pp. 326-330.

[thumbnail of IbM PLTS Floating House for fishermen aims to increase the productivity of fresh fish fishery products and meet the electricity needs of housing in Lake Tempe] Text (IbM PLTS Floating House for fishermen aims to increase the productivity of fresh fish fishery products and meet the electricity needs of housing in Lake Tempe)
Prosiding Nas Abdi5.pdf - Published Version

Download (526kB)

Abstract

IbM PLTS Floating House for fishermen aims to increase the productivity of fresh fish fishery products and meet the
electricity needs of housing in Lake Tempe. The benefits of this activity are to increase fishery production and the economy.
PLTS IbM activities include training on the functions of PV mini-grid components, skills in assembling and operating PV
mini-grid and its maintenance. The test results of the solar panel voltage are 16V, the average sun intensity is 983 W / m2.
The battery charge voltage is 12V / 50Ah 13.6 V, for 5 hours every day. Loads of 5 DC 12V / 10W LED lights, used for 8
hours. The electricity supply comes from a battery, and is controlled by a solar charger controller when charging the battery.
Solar Panel is an alternative energy to meet the electricity needs of lighting fishermen's floating houses and provide benefits
to fishermen.

Item Type: Article
Subjects: T Technology > TJ Mechanical engineering and machinery
Divisions: Jurusan Teknik Mesin > D4 Teknologi Rekayasa Energi Terbarukan
Depositing User: Unnamed user with username 197202012001121002
Date Deposited: 14 May 2023 13:43
Last Modified: 14 May 2023 13:43
URI: https://repository.poliupg.ac.id/id/eprint/1960

Actions (login required)

View Item
View Item