Determining Interval Time of Maintenance in Bosowa Cement Indonesia using Reliability Method

Muhammad, Arsyad Suyuti and Rusdi, Nur (2016) Determining Interval Time of Maintenance in Bosowa Cement Indonesia using Reliability Method. Intek (Informasi Teknologi) Jurnal Penelitian, 3 (2). pp. 62-65. ISSN 2339-0700

[img]
Preview
Archive (Artikel)
52-145-1-PB_INTEK.pdf

Download (3MB) | Preview
[img]
Preview
Archive (Peer review)
Peer Review INTEK_2.pdf

Download (951kB) | Preview
[img]
Preview
Archive (Hasil Cek Plagiasi)
Hasil Plagiasi INTEK 2016_1.pdf

Download (316kB) | Preview

Abstract

Maintenance for machining and production facility is an important aspect to ensure a smooth production process. During this time, it was performed regular maintenance based on technical advice from supplier's engines which just shows things in general without considering the actual operating conditions. This paper aims to plan the maintenance strategies for the Finish Mill unit based on reliability analysis by considering the target system reliability and cost of improving reliability.

Item Type: Article
Subjects: T Technology > TJ Mechanical engineering and machinery
Divisions: Department of Mechanical Engineering > Teknik Mesin
Depositing User: Dr Rusdi Nur
Date Deposited: 15 Dec 2016 07:14
Last Modified: 26 Mar 2019 11:14
URI: http://repository.poliupg.ac.id/id/eprint/88

Actions (login required)

View Item View Item